|
Zirku Island
|
|
| |
| Name of the Terminal |
ZIRKU Petroleum Port |
| Name of Crude |
UZ Crude Blend |
| The Number of Berths |
Two |
| Type of Berth |
SPMs |
| Berth Restriction |
Max. Arrival TRIM is 3 Meters. Tanker should carry 30% of DWT in cargo or Ballast (O.B.Q.) to berth. |
| Draft Restriction |
Max. Sailing Draft is 21 Meters |
| Vessel Acceptance |
Max. DWT 420,000 / Min. DWT 35,000 |
| Maximum Exportable Cargo |
Subject to Tanker Specification (Beams, D.Wt. Draft) | |
|
| |
|
|